Water Stewardship


Coquitlam Diking District:

As-Constructed Dike Drawings and Significant Reports and Studies


FRASER RIVER FLOOD CONTROL PROGRAM AS-CONSTRUCTED DRAWINGS

COQ-OM-M-4
(pdf 28mb)
District of Coquitlam City of Port Coquitlam   Operations and Maintenance Instructions, Flood Control Works, Volume 3 2 AS CONSTRUCTED DRAWINGS  Part 1 - Pitt River Flood Control Works Part 2 - Coquitlam River Flood Control Works  Crippen Engineering Ltd., Associated Engineering

STUDY REPORTS

W-2805
(pdf 6.1mb)
City of Port Coquitlam   Coquitlam River Hydrology Review Water Management Consultants

UMFW 2007 AS-BUILT DRAWINGS AND DESIGN REPORTS

Coquitlam R left bank dwgs.
(pdf 1.7mb)
City of Port Coquitlam   Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank  Associated Engineering
Pitt R right bank dwgs.
(pdf 1.7mb)
City of Port Coquitlam   Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike  Associated Engineering
Harbour St Stn&Valiant Sort. (pdf 745kb) City of Port Coquitlam   Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pumpstation  Associated Engineering, Golder Associates
Pitt R Dike geot. (pdf 7.7mb) City of Port Coquitlam   Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works Pitt River Dike, Port Coquitlam BC Golder Associates
Colony fm geot.
(pdf 4.8mb)
City of Port Coquitlam   Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works IR#2 and Colony Farms Dike Pitt River Road  Port Coquitlam BC Golder Associates